skip to Main Content

to-the-point Brazil clears 72 MW of renewables for incentives regime

November 13 – Brazil’s Ministry of Mines and Energy approved three renewable projects with 72 MW of combined capacity to enter the national Incentive Regime for Infrastructure Development (REIDI).

The projects will cost some BRL 336 million (USD 88.5m/EUR 82.1m) in total. All the plants are located in the state of Bahia.

More details are available in the table below.

Project (type) Capacity Cost in BRL Operation date
Laranjeiras IX (wind) 24 MW 109.6 million January 1, 2019
Pau Santo (wind) 18 MW 65.6 million October 1, 2017
Caetite 2 (solar) 30 MW 161 million October 1, 2017

REIDI, launched in 2007, grants tax incentives to companies investing in infrastructure projects within the transport, energy, sanitation and irrigation sectors.

(BRL 1 = USD 0.264/EUR 0.245)

Recommends:

X-Dragon 10000mAh Dual USB Solar Power Bank for iPhone 6 Plus, 5s, 5c, 5, 4s, iPod, Samsung Galaxy S6, S6, Edge S5, S4, S3, Note 4, 3, LG, G3, Nexus, HTC One M9, Gopro Camera, GPS – Orange
“Deal price for Black Friday, contact us if you have any question Please check whether you buy the right high quality product from…

Like have 30000mah Dual USB Portable Solar Panel Power Bank
Specifications:
Electric Core Type: Solar Powered
Charging time: About 13 hours
Solar Panel: 1.5W
Input: DC5.0V, 1.0A(Max)
Ou…

Solar Power Bank

This Post Has 0 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Back To Top