Elecnor plans 105-MW CSP plant in Chile
Jun 19, 2015 18:27 CEST
June 19 – Chile’s environmental authorities in the northern Arica region on Friday accepted for evaluation a 105-MW concentrated solar power (CSP) project submitted by Elecnor Chile SA, the local unit of Spanish power company Elecnor SA (BME:ENO).
The Camarones project consists in a solar power tower with a 220-kV grid connection, to be built with a total investment of USD 800 million (EUR 706.1m).
The company plans to install the plant in a desert area close to road infrastructure but separated from populated sectors within the Camarones municipality as of the middle of 2016. The facility is scheduled to operate 30 years as of 2019.
Chilean consultancy Mayco Consultores was in charge of the environmental study.
(USD 1 = EUR 0.883)
Recommends:
ALLPOWERS 10000mAh Solar Panel Charger with iSolar Technology for iPhone, iPad, Samsung and other 5V USB devices (Black)“Your Satisfaction is our Highest Priority”, contact us firstly if you have any question ALLPOWERS: Always Power Your Life Wheneve…
Solar Charger – Creative Edge(TM) Solar-5 Solar Panel 5000mAh Water/ Shock/ Dust Resistant Portable Backup Power Bank Pack Dual USB Charger for iPhone 6, 6 Plus, 5s, 5c, 4s, 4, iPods, iPad Mini Retina (Apple Lightning Adapter Included), Samsung Galaxy Note 3, Note 4, S3, S4, S5, Most Android/Windows Smart Cell Phones, GPS, Tablets, and Other USB-charged DevicesThe Original Creative Edge Solar-5 Solar Panel 5000mAh Charger!
Charge Anywhere – Plug it into the wall to charge and take with y…
Orange Dual USB Port Portable Charger Backup External Battery Pack ; Power Bank for iPhone 6,6+,5S, 5C, 5, 4S, 4, iPad Air, Mini Samsung Galaxy S6,S5, S4, S3 Note 4,3,2, Android Smartphone and Tablets ect; Two Mini Mini USB LED Light for Free.The Advantages are Extensive:
*Support for solar charging. Solar energy technology, environmental friendly and could recharge …
Solar Power Bank